ANALISA PERBANDINGAN PENJADWALAN PRODUKSI DENGAN METODE CDS (CAMPBELL DUDEK SMITH), EDD (EARLIEST DUE DATE) DAN FCFS (FIRST COME FIRST SERVE) PADA PT. SARI WARNA ASLI UNIT V
Abstract
The methods used in this research are the CDS method, the EDD method and the FCFS method. The purpose of this research is to minimize the production time and determine the best method that can be applied to the company.
The results of this research showed that the makespan obtained in the company's scheduling system with FCFS rules was 458 minutes, and the results of scheduling using the CDS method obtained a makespan value of 329 minutes, then the best production scheduling method that had the smallest makespan value was the CDS method.
Keywords
Teks Lengkap:
PDFReferensi
Ervil, Riko, and Dela Nurmayuni. 2018. “Penjadwalan Produksi Dengan Metode Campbell Dudek Smith (Cds) Untuk Meminimumkan Total Waktu Produksi (Makespan).” Jurnal Sains Dan Teknologi: Jurnal Keilmuan Dan Aplikasi Teknologi Industri 18(2):97. doi: 10.36275/stsp.v18i2.118.
Jadwal, Pada, Perawatan Dan, Jadwal Produksi, Teuku Anggara, and Achmad As. 2019. “Review Penerapan Metode Campbell Dudek Smith ( CDS ).” 2–3.
Nasrullah Syariful Anam, Viktor Wahanggara. 2018. “Implementasi Metode FCFS ( First Come First Served ) Pada Aplikasi Pemesanan Makanan Menggunakan QR Code Berbasis Web Service Studi Kasus : Mie Kober Jember Nasrullah Syariful Anam ( 1310651018 ) Viktor Wahanggara , S . Kom , M . Kom Program Studi Teknik.”
Ramadhan, et al., D. 2015. “ISSN 2338-137X Rancang Bangun Sistem Informasi Penjadwalan Produksi Menggunakan Aturan Prioritas ISSN 2338-137X.” 4(2):1–8.
DOI: https://doi.org/10.24176/jointtech.v1i2.6499
Article Metrics
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
Publisher: Lembaga Penelitian dan Pengabdian kepada Masyarakat (LPPM), Universitas Muria Kudus Jl. Lingkar Utara UMK, Gondangmanis, Bae, Kudus, 59327 - Central Java, Indonesia Website: https://lppm.umk.ac.id